Information Information
We make things that work better and last longer. Our products solve real problems with clean design and honest materials.
Tel:+44 7943 938797
hello@JustDropShip.co.uk
Join the Experience
Payment methods
Extra Long Reach & Reliable Data Transmission (Model: PF16)[cite: 13]
|
2 Meters Long
Extra Reach & Flexibility[cite: 13]
|
2.4A Output
Fast Charging Performance[cite: 13]
|
Data Sync
Fast Transmission Support[cite: 13]
|
The Panther Force PF16 2M Cable provides extra-long reach and supports fast charging and data transmission for your Apple devices[cite: 13].
Engineered with high-quality materials for long-lasting use, 2.4A power output, and a clean white finish[cite: 13], this 2-meter cable is ideal for home, office, and travel convenience[cite: 13].
Fast Charging & SyncSupports efficient fast charging and smooth data transmission simultaneously[cite: 13]. |
2.4A Current OutputDelivers up to 2.4A output power to charge your Apple iPhone and accessories quickly and reliably[cite: 13]. |
2-Meter Extra ReachProvides a generous 2 meters of length, making it ideal for comfortable couch, bed, or office desk use[cite: 13]. |
Strong & DurableConstructed with high-quality material for long-lasting use, ensuring resistance against everyday wear[cite: 13]. |
Safe & ReliableDesigned with safe electrical parameters to protect your device battery health during routine charges[cite: 13]. |
Wide CompatibilityFully compatible with most standard USB devices and Apple Lightning port models[cite: 13]. |
| Cable Length | 2 Meters (200 cm)[cite: 13] |
| Connector Types | USB Type-A Male to Apple Lightning Male[cite: 13] |
| Estimated Product Weight | Approx. 45 g – 60 g |
| Estimated Packaged Weight | Approx. 80 g – 105 g |
Important: Weights and dimensions are estimated for shipping convenience. Please check the physical packed item for precise postage metrics.
|
|
| 1 | Plug the USB-A end into any standard wall charger, power bank, or computer port. |
| 2 | Connect the Lightning end directly into your iPhone or Apple device[cite: 13]. |
| 3 | Enjoy stable 2.4A fast charging and convenient data sync from a distance[cite: 13]. |
| Specification | Details |
|---|---|
| Product Type | Fast Charge / Sync USB Data Cable[cite: 13] |
| Brand | Panther Force[cite: 13] |
| Model Number | PF16[cite: 13] |
| Cable Length | 2 Meters (2M)[cite: 13] |
| Output Current | 2.4A (Max)[cite: 13] |
| Functions | Fast Charging & Data Transmission[cite: 13] |
| Colour | White Finish |
| Quantity | 1 × 2M Lightning Cable |
✓ 1 × Panther Force PF16 2M USB to Lightning Cable[cite: 13]
✓ Official Retail Hanging Box Packaging[cite: 13]
✓ Wall adapters and devices shown in promotional images are for illustration purposes only and are not included
Your reliable 2-meter connection solution for Apple devices.